FACILITY | LOCATION | COUNTRY | CLIENT | YEAR | MAIN DATA | WASTE TYPE AND CAPACITY | PRODUCT |
---|---|---|---|---|---|---|---|
MSW treatment plant | Rochefort | France | VINCI environnement | 2021 | 1 Pre - treatment and fine line | MSW pretreatment: 25 t/h fines: 16 t/h | MSW |
MSW treatment plant - RDF production | Suleymaniye | Irak | Lafarge | 2021 | 1 main pretreatment line split into, 1 biodrying line, 2 post-treatment line | 85ton/h | MSW |
MSW TREATMENT PLANT | DJELFA | ALGERIA | ENVIROMED | 2021 | Manual Plant | MSW 20 t/h | MSW |
REVAMP SUBCOAL PLANT | DELFZIJL | Netherlands | N+P | 2021 | Reject 13,3 t/h | Reengineering | |
Biodrying System for MSW | Juan Grande | Spain | Ferrovial Servicios | 2021 | MSW | ||
Biodrying System for Biological Waste | Cerceda | Spain | Thenomaq Galicia | 2021 | Biological | ||
Reengineering of Light packaging Facility | Góngora, Navarra | Spain | Ecoembes | 2021 | Film suction system | - | Reengineering |
Reengineering of Metals treatment plant | Castellbisbal, Barcelona | Spain | ALBERICH | 2021 | upgrade bulky and light material line | Reengineering | |
Composting with Covertech | Areosa, Cerceda | Spain | Thenomaq Galícia | 2021 | - | Biological | |
Glass recovery tapes in Caudete | Caudete de las Fuentes | Spain | Picvisa / Calaf industrial | 2021 | Modifications | - | Reengineering |
Pre-Treatment Plant with RDF production | Querétaro | México | Broquers Ambiental | 2021 | - | MSW | |
Pre-Treatment MSW, EELL and refining plant | Menorca | Spain | Ferrovial Servicios | 2021 | Finished project | RSU:30t/h; EELL:5t/h; refining:15t/h | MSW, EELL and refining plant |
Sorting line for OMR | Calais | France | Urbaser Environnement | 2021 | Project in progress | 30t/h | MSW |
Light Packaging Treatment plant upgrading | Lisboa | Portugal | Valorsul | 2021 | Project in progress | - | |
Arico | Spain | 2021 | - | ||||
Titan | USA | Titan | 2021 | MSW | |||
Essex MSW Treatment Plant | Basildon, Essex | United Kingdom | UBB | 2020 | Treatment plant Extras | MSW | |
MSW Treatment Plant | Bèziers | France | Bioreva | 2020 | MSW | ||
Zubieta | Zubieta | Spain | Urbaser | 2020 | MSW | ||
PreTreatment of OFMSW | Las Dehesas | Spain | FCC | 2020 | Biological | ||
Composting line | El Campello | Spain | FCC | 2020 | Glass recovering | - | Biological |
Light Packaging Treatment line | Celrà | Spain | Tirgi | 2020 | - | Light Packaging | |
MSW Treatment plant | Serín | Spain | Ecoembes | 2020 | Instalation of one Open Crash and one "Caja de vuelo" | 14 Tarpaulins | MSW |
MSW treatment plant (Fase I) | For Sur Mer | France | Urbaser Environnement | 2020 | 4 lines of pretreatment of MSW | 4x40tn/h | MSW |
MSW treatment plant (Fase I) | For Sur Mer | France | Urbaser Environnement | 2020 | Flame-retard conveyor belt 3B REX | MSW | |
MSW treatment plant (Fase I) | For Sur Mer | France | Urbaser Environnement | 2020 | Dissamble the existing conveyor belts | MSW | |
MSW treatment plant (FaseII) | For Sur Mer | France | Urbaser Environnement | 2020 | 1 line of secundari pretreatment + 1 line od refinning after biological treatment | Pretreatment: 40tn/h | MSW |
MSW treatment plant | Cornwall | United Kingdom | VINCI | 2020 | 2 UP conveyor Belts to transport the burn material rejects | 20tn/h | MSW |
Commingled treatment plant upgrading | Norton | United Kingdom | Mercia Waste Management | 2020 | Instalation of Glass Breakers and conveyor belts | 30tn/h 100000tn/año | Reengineering |
Industrial treatment plant | HOSPITALET (BCN) | Spain | Gelabert Gestión de Residuos | 2020 | Industrial treatment plant | 15t/h | Reengineering |
Light packaging treatment plant upgrading | Urnieta | Spain | Trienekens | 2020 | Upgrade the light packaging line | 3 t/h | Reengineering |
Comercial-industrial SRF's Waste Plant | Castellbisbal | Spain | Ferimet (Grupo CELSA) | 2020 | shredder treatment line | Reengineering | |
Comercial-industrial SRF's Waste Plant | Bilbao | Spain | Ferimet (Grupo CELSA) | 2019 | Junk treatment line | Reengineering | |
Comercial-industrial SRF's Waste Plant | Bilbao | Spain | Ferimet (Grupo CELSA) | 2019 | New supply | ||
Essex MSW Treatment Plant | Basildon, Essex | United Kingdom | UBB | 2019 | Facility modifications | ||
Industrial - comercial treatment plant - RDF Production | Valencia | Spain | Ferimet (Grupo CELSA) | 2019 | Scrap metal treatment line | Industrial | |
Composting plant | Clariana del Cardenès, Solsona | Spain | Consell Comarcal del Solsonès | 2019 | Masias Covertech technology treatment for MSW organic fraction and FORM | 14 Tarpaulins | Biological |
Composting plant | Clariana del Cardenès, Solsona | Spain | Consell Comarcal del Solsonès | 2019 | Primus + Jocker | Reengineering | |
Geo-Tainer | Indonesia | HOLCIM | 2019 | Mobile biodrying for MSW with Masias Covertech | MSW | ||
MSW-Refinning facility optimization | Lloret de Mar, Girona | Spain | GBI | 2019 | Modifications at MSW treatment plant | Reengineering | |
Industrial Facility Modification | Tudela, Navarra | Spain | FCC | 2019 | Industrial ???? | IND | |
MSW - Biologics Reengineering (Ecoparc-1) | Barcelona | Spain | Ecoparc de Barcelona | 2019 | Conveyor Belt PK | - | Reengineering |
MSW- CDR- Light packaging Facility. Reengineering | Seixal | Portugal | Amarsul | 2019 | Optimization of the MSW facility | MSW | Reengineering |
Reenginering of MSW facility of Vallés Occidental | Vacarisses, Barcelona | Spain | UTE CTR Vallés | 2019 | Glass recuperation instalation | Reengineering | |
Reengineering at Light packaging and MSW Treatment plant (Ecoparc-2) | Barcelona | Spain | Ecoparc del Besós | 2019 | Ferreous line recuperation | RSU | Reengineering |
Reengineering at Light packaging and MSW Treatment plant (Ecoparc-2) | Barcelona | Spain | Ecoparc del Besós | 2019 | Sieve drum plastic recuperation | RSU | Reengineering |
MSW plant optimization | Istambul | Turkey | RECYDIA / HEREKO | 2019 | MSW recycling and refinement of the RDF/SRF product, | Municipal Solid Waste, 2000 t/day capacity | Reengineering |
MSW treatment plant | Ferreiros | Portugal | ABB + DST | 2019 | MSW Pre treatment with SRF production and separation | MSW: 1 X 30 t/h 100.000 t/year | MSW |
Essex MSW Treatment Plant | Basildon, Essex | United Kingdom | UBB | 2019 | 3 MSW Mechanical Pre-treatment Plant + 1 Refinemente Plant | MSW: 3 X 40 t/h | MSW |
Essex MSW Treatment Plant | Basildon, Essex | United Kingdom | UBB | 2019 | Aditional cabins | ||
Neales C&I Treatment plant | Blackburn | United kingdom | NEALES WASTE MANAGMENT | 2019 | 1 Mechanical Pre-treatment Plant | C&I: 30 t/h | Industrial |
MSW treatment plant | Murcia | Spain | CESPA | 2019 | RSU - Light Packaging and Bulky treatment plant | MSW: 2 x 40Tn/h, Light Packaging: 1 x de 7Tn/h, RDF'd/ Bulky: 1 x 10tn/h | MSW |
MSW treatment plant | Murcia | Spain | CESPA | 2018 | Film suction system instalation | MSW | |
MSW treatment plant | Murcia | Spain | Ferrovial | 2018 | 5 modifications | MSW | |
MSW treatment plant | Pedret i Marçà | Spain | GBI - FCC | 2018 | Pre-treatment, refine and compost line | RSU: 9tn/h | MSW |
Industrial - comercial treatment plant - RDF Production | San Martín de la Vega, Madrid | Spain | LYRSA | 2018 | Fragmentation tretatment line - light packaging | SLF - 40 ton/h | Industrial |
Industrial - comercial treatment plant - RDF Production | San Martín de la Vega, Madrid | Spain | LYRSA | 2018 | Increasing the Conveyor belt and Bulky sieve | SLF - 40 ton/h | Industrial |
Industrial waste plant- RDF production | Valencia | Spain | Ferimet (Grupo CELSA) | 2018 | Shredding treatment line | RPM- 9 ton/h | Industrial |
Industrial - comercial treatment plant - RDF Production | Valencia | Spain | Ferimet (Grupo CELSA) | 2018 | Plataformas adicionales | Industrial | |
Industrial waste plant- RDF production | Guatemala | Guatemala | Cementos Progreso | 2018 | Industrial line | IW - 15 ton/h | Industrial |
Aluminium sorting system modification | Castellbisbal, Barcelona | Spain | ALBERICH | 2018 | Foucault modification | - | Reengineering |
Metal line optimization | Castellbisbal, Barcelona | Spain | ALBERICH | 2018 | Supply line implementation fragmentation unit, with a feed hopper 25 m3 | Shredders Land- 20 ton/h | Reengineering |
Light packagins plant modification | Castellbisbal, Barcelona | Spain | ALBERICH | 2018 | Light packaging line modification Shredding plant | SLF-6 ton/h | Reengineering |
Reengineering of Metals treatment plant | Castellbisbal, Barcelona | Spain | ALBERICH | 2018 | Modification of the shredding Line (Zorbas) | Reengineering | |
MSW plant optimization | Moita (Palmela) | Portugal | AMARSUL | 2018 | MSW plant optimitation | MSW | Reengineering |
MSW plant optimization | Botarell/ Tarragona | Spain | Consorci Baix Camp | 2018 | Conveyor Belt | - | Reengineering |
RDF line optimization | Istres | France | SITA | 2018 | Windsifter instalation in a Existing CSR production line | Industrial - CSR 20 t/h | Reengineering |
MSW line optimization | Segovia | Spain | FCC | 2018 | Film suction system | Film -500 kg/h | Reengineering |
Light packaging sorting plant | Brazil | SBC Valorização de residuos SA | 2018 | 1 mecanical recyclables line + 1 manual separation line | 6 ton/h | Light packages | |
Industrial treatment plant reengineering | Vic, Barcelona | Spain | Promic | 2018 | Food products screening instalation | Reengineering | |
Others | Suldouro | Portugal | Tomra TITECH | 2018 | Accelerator Conveyor Belt + "Caja de vuelo" | Others | |
Upgrading of MSW treatment plant of Vademingómez (Las Dehesas) | Madrid | Spain | Urbaser - UTE Vertresa | 2018 | Conditioning equipment | Reengineering | |
Light packaging separation plant | Tudela, Navarra | Spain | FCC | 2018 | Light Packaging line modification | - | Reengineering |
Municipal Sold Waste plant modification | Tudela, Navarra | Spain | FCC | 2018 | Aditional Ballistic by-pass | - | Reengineering |
MSW facility optimization (Ecoparc-1) | Barcelona | Ecoparc | Ecoparc de Barcelona | 2018 | Upgrading of existing mechanical pre-treatment Plant | MSW | Reengineering |
MSW - Biologics Reengineering (Ecoparc-1) | Barcelona | Spain | Ecoparc de Barcelona | 2018 | Optical structure modification | Reengineering | |
MSW - Biologics Reengineering (Ecoparc-1) | Barcelona | Spain | Ecoparc de Barcelona | 2018 | Fraction transport & baler Line | Reengineering | |
MSW - Biologics Reengineering (Ecoparc-1) | Barcelona | Spain | Ecoparc de Barcelona | 2018 | By-Pass Modification | Reengineering | |
MSW - Biologics Reengineering (Ecoparc-1) | Barcelona | Spain | Ecoparc de Barcelona | 2018 | Conveyor Belt | - | Reengineering |
MSW and OFMSW Treatment Plant of Valnor | Alter do Chao | Portugal | Valnor | 2018 | Installation of I+D Pilot biological unit CDR's | Biological | |
MSW Treatment Plant | Caudete, Valencia | Spain | UTE Ecored | 2017 | 1 MSW Pre-treatment line + Refinement | MSW: 25 t/h | MSW |
MSW Treatment Plant | Caudete, Valencia | Spain | UTE Ecored | 2017 | Pulpistas" Cabins | MSW | |
RDF Production & Recovery Plant | Trondheim | Norway | Steco | 2017 | 1 C&I Mechanical Treatment Line | RDF: 25 t/h | RDF |
Reengineering at Light packaging and MSW Treatment plant (Ecoparc-2) | Barcelona | Spain | Ecoparc del Besós | 2017 | Upgrading of existing mechanical pre-treatment Plant- Film suction system | MSW | Reengineering |
Apeval Food Waste Treatment Plant | La Tardiere | France | Apeval | 2017 | 1 Food Waste Mechanical and Thermal Drying treatment plant (Fase I) | IND: 10 t/h | Biological |
Apeval Food Waste Treatment Plant | La Tardiere | France | Apeval | 2017 | 1 Food Waste Mechanical and Thermal Drying treatment plant (Fase II) | Biological | |
Resitejo MSW Valorization Plant | Chamusca | Portugal | Resitejo | 2017 | 1 x Mechanical and Thermal Drying Treatment Plant | MSW: 1 X 30 t/h | MSW |
Recydia MSW Treatment Plant (Re+) | Istambul | Turkey | RECYDIA / HEREKO | 2017 | 2 MSW Mechanical Pre-treatment Plant + Biodryer + Mechanical treatment of the dry material. SRF production | MSW: 2 X 62,5 t/h | MSW |
MSW Treatment Plant | Ferreiros | Portugal | ABB + DST | 2017 | 1 MSW pretreatment line (50.000 t/year) | MSW: 25 t/h | MSW |
Anaerobic digestion collection technology | Granollers | Spain | C. Residus Vallès Oriental | 2017 | Collection system for the floating element of pulper anaerobic digestion | - | Reengineering |
Rengineering of the existing compost plant at Tremp | Tremp | Spain | Consell Comarcal del Pallars Jussà | 2017 | Upgrade the existing compost plant | Reengineering | |
Rengineering of the industrial treatment plant | Vic, Barcelona | Spain | Promic | 2017 | Transport drum sunk off | Reengineering | |
Industrial Waste Treatment Plant | Tudela, Navarra | Spain | FCC | 2017 | 1 industrial waste treatment line | IND: 15 t/h | Industrial |
Light packaging treatment plant upgrading | ?? | Portugal | Resinorte | 2016 | Incresing the light packaging treatment plant | ?? | Light packages |
MSW treatment plant - Refinning | Seixal | Portugal | Amarsul | 2016 | Alteraçao aos taètes do refugo da CTA do RSU | ?? | RSU |
MSW upgreade | Alter do Chao | Portugal | Valnor | 2016 | Upgrade of the MSW treatment line | MSW | |
MSW Treatment Plant | Cervera del Maestre, Castellón | Spain | UTE Teconma-Azahar-Ecodeco | 2016 | 1 MSW pretreatment line, with biodrying | MSW: 25 t/h | MSW |
Commingled Waste Treatment Plant | Waterbeach | United Kingdom | Amey Cespa | 2016 | 2 Commingled treatment lines | Commingled: 2 x 12 t/h | Commingled |
MSW Treatment Plant | Lliria, Valencia | Spain | UTE Ecored | 2016 | 1 MSW pretreatment line | MSW: 35 t/h | MSW |
MSW Treatment Plant | Lliria, Valencia | Spain | UTE Ecored | 2016 | Pulpistas" Cabins | MSW | |
Metals treatment plant | Castellbisbal, Barcelona | Spain | ALBERICH | 2016 | Cooper treatment plant | MET | |
Rengineering of the existing refinninf treatment plant | Botarell/ Tarragona | Spain | Consorci Baix Camp | 2016 | Upgrade at refinning treatment plant and sieve drum | Reengineering | |
Upgrading of MSW treatment plant of Vademingómez (Las Dehesas) | Madrid | Spain | Ute Vertresa | 2016 | Upgrade of existing plant | Reengineering | |
MSW treatment plant - Refinning | Seixal | Portugal | Amarsul | 2016 | Refinning facility | ?? | MSW |
OFMSW Composting Plant of La Selva | Sta. Coloma de Farners, Girona | Spain | Consell Comarcal de La Selva | 2016 | 1 MSW pretreatment line (12.500), 1 OFMSW pretreatment line (5.000), 5 aerobic digestion tunnels, 1 compost refinement line | Aerobic Digestion Tunnels: 5 Refinement: 6 t/h | Biological |
Upgrade of the Composting Plant of El Bages | Manresa, Barcelona | Spain | Consorci del Bages | 2016 | Upgrade of the existing OFMSW pretreatment line | OFMSW: 8 t/h | Reengineering |
Upgrade of the MSW Composting Plant of Amarsul | Setubal | Portugal | Amarsul | 2016 | Upgrade of the existing MSW pretreatment line, including automatic optical separation | MSW: 25 t/h | Reengineering |
Upgrade of the MSW Treatment Plant of Marsella | Marseille | France | Everé | 2015 | Upgrade of the existing OFMSW pretreatment line | MSW: 50 t/h | MSW |
MSW treatment plant | Marseille | France | Everé | 2015 | Slag Charing system | Reengineering | |
Upgrade of the MSW Treatment Plant of Marsella | Marseille | France | Everé | 2015 | By-Pass Modification | Reengineering | |
MSW Anaerobic Digestion Plant | Alter do Chao | Portugal | Valnor | 2015 | Facility of 8 anaerobic digestion tunnels (25.000 t/year) | Anaerobic Digestion Tunnels: 8 | Biological |
RDF Production Plant | Alter do Chao | Portugal | Valnor | 2015 | 1 RDF production line | RDF: 20 t/h | RDF |
Metals treatment plant | Castellbisbal, Barcelona | Spain | ALBERICH | 2015 | scrap metal treatment plant | MET | |
MSW Treatment Plant | Lloret de Mar, Girona | Spain | GBI | 2014 | 1 MSW pretreatment line, 1 compost refinement line | MSW: 30 t/h | MSW |
MSW and OFMSW Treatement Plant of Amarsul | Seixal | Portugal | Soares da Costa | 2014 | 2 MSW pretreatment lines, 1 OFMSW pretreatment line | MSW: 34 T/H OFMSW: 6,5 T/H | MSW |
MSW Waste Treatement Plant of Vallés Occidental | Vacarisses, Barcelona | Spain | UTE CTR Vallés | 2014 | 3 MSW pretreatment lines, 1 compost refinement line | MSW: 3 x 25 t/h Refinement: 20 t/h | MSW |
Resinorte MSW Treatment Plant | Guimarães | Portugal | Amave | 2014 | 2 MSW pretreatment lines, 1 final product baging system | MSW: 42 t/h | MSW |
Automation of the Dry Recyclables Treatment Plant of Valorsul (Resioeste) | Cadaval | Portugal | Resioeste | 2014 | Automatization of the light packging sorting line | Dry Recyclables: 4 t/h | Light packages |
MSW Treatment Plant of Planalto Beirao | Viseu | Portugal | EcoBeirao | 2014 | 1 MSW pretreatment line | MSW: 31 t/h | MSW |
Light Packaging - MSW Treatment Plant (Ecoparc-2) | Barcelona | Spain | Ecoparc del Besós | 2014 | 1 Dry Recyclables sorting line, including bag opener and balistic separator | Dry Recyclables: 6 t/h | Light packages |
RDF Production Plant | Athens | Greece | General Recycling | 2014 | 1 RDF production line | RDF: 10 t/h | RDF |
C&D Waste Treatment Plant | El Prat, Barcelona | Spain | Gestora de Runes | 2014 | 1 C&D waste treatment line | C&D: 100 t/h | CD |
Automatization of the Dry Recyclables Treatment Plant of Resinorte | Guimarães | Portugal | Resinorte | 2014 | Automatization of the light packging sorting line (12.000 t/year) | Dry Recyclables: 2,5 t/h | Light packages |
Automatization of the Dry Recyclables Treatment Plant of Suldouro | Vila Nova de Gaia | Portugal | Suldouro | 2014 | Automatization of the light packging sorting line | Dry Recyclables: 3,5 t/h | Light packages |
Commingled Waste Treatment Plant | Hereford and Worcester | United Kingdom | Mercia Waste Management | 2014 | 2 Commingled treatment lines | Commingled: 2 x 14 t/h | Commingled |
MSW Treatment Plant of Valorlis | Leiria | Portugal | Efacec | 2014 | 1 MSW pretreatment line | MSW: 18 t/h | MSW |
C&D Waste Treatment Plant of Transucatas | Seixal | Portugal | Transucatas | 2014 | 2 C&D waste treatment lines | C&D: 80 t/h | CD |
Automatization of the Dry Recyclables Treatment Plant of Amarsul | Seixal | Portugal | Amarsul | 2014 | Automatization of the light packging sorting line | Dry Recyclables: 4 t/h | Light packages |
Automatization of the Dry Recyclables Treatment Plant of Valnor | Alter do Chao | Portugal | Valnor | 2014 | Automatization of the light packging sorting line (12.000 t/year) | Dry Recyclables: 2,5 t/h | Light packages |
Automatization of the Dry Recyclables Treatment Plant of Valorsul | Lisbon | Portugal | Valorsul | 2014 | Automatization of the light packging sorting line (25.000 t/year) | Dry Recyclables: 6 t/h | Light packages |
Dry Recyclables Treatment Plant | Athens | Greece | General Recycling | 2014 | 2 Dry Recyclables sorting lines | Dry Recyclables: 2 x 10 t/h | Light packages |
Dry Recyclables Treatment Plant | Huesca | Spain | Urbaser | 2014 | 1 Dry Recyclables sorting line (10.000 t/year) | Dry Recyclables: 2 t/h | Light packages |
Automatization of the Dry Recyclables Treatment Plant | Góngora, Navarra | Spain | Servicios de la Comarca de Pamplona | 2014 | Automatization of the light packging sorting line (7.500 t/year) | Dry Recyclables: 2,5 t/h | Light packages |
MSW Treatment Plant | Shanghai | China | Shangai Biomax Green Energy | 2014 | 2 MSW pretreatment lines (450.000 t/year) | MSW: 2 x 40 t/h | MSW |
MSW and OFMSW Treatment Plant of Valnor | Alter do Chao | Portugal | Valnor | 2014 | 1 MSW pretreatment line, 2 OFMSW pretreatment line | MSW: 25 t/h OFMSW: 15 t/h | MSW |
Planta de selección y trituración de RCD,s | Asturias | Spain | CONTEMAX | 2014 | 1 C&D waste treatment line | C&D: 150 t/h | C&D |
Planta de selección y compostaje | Port Harcourt | Nigeria | Government Rivers State | 2014 | MSW | ||
MSW facility (Ecoparc-1) | Barcelona | Spain | UTE Ecoparc | 2014 | 3 MSW pretreatment lines (300.000 t/year) | MSW: 3 x 25 t/h | MSW |
C&D Waste Treatment Plant of Montaspre | St. Julia de Ramis, Girona | Spain | Serveis Ambientals Montaspre | 2014 | 1 C&D waste treatment line (60.000 t/year) | C&D: 40 t/h | CD |
Bulky Waste Treatment Plant | Ortuella, Vizcaya | Spain | Berziklatu | 2014 | 1 bulky and wood treatment line (50.000 t/year) | Bulky: 15 t/h | MSW |
C&D Waste Treatment Plant | Peralada, Girona | Spain | GRC, CBS, HUMA-UTE | 2014 | 1 C&D waste treatment line (70.000 t/year) | C&D: 40 t/h | CD |
Planta de compostaje | Solius | Spain | GBI | 2014 | FORM | ||
Dry Recyclables Treatment Plant | Vic, Barcelona | Spain | Urbaser | 2014 | 1 light packging automatic sorting line (15.000 t/year) | Dry Recyclables: 4 t/h | Light packages |
C&D Waste Treatment Plant of Vitoria | Vitoria, Álava | Spain | UTE SUFI SA - LAMBIDE SA – ESCOR SL | 2014 | 2 C&D waste treatment lines (250.000 t/year) | C&D: 75 t/h | CD |
Automatization of the Dry Recyclables Treatment Plant | Vitoria, Álava | Spain | UTE Jundiz | 2013 | Automatization of the light packging sorting line (10.000 t/year) | Dry Recyclables: 3 t/h | Light packages |
Planta de selección y compostaje | Arazuri | Spain | Arazuri-Gongora UTE | 2013 | MSW | ||
Afino de compost | Vitoria | Spain | Biocompost de Alava | 2013 | MSW | ||
Ampliación planta de selección | Botarell-Baix Camp (Tarragona) | Spain | Comsa Medio Ambiente | 2013 | MSW | ||
MSW Treatment Plant | Tudela, Navarra | Spain | FCC | 2013 | 1 MSW pretreatment line (50.000 t/year), including 1 balistic separator and 3 optical sorters | MSW: 25 t/h | MSW |
MSW Treatment Plant | Shanghai | China | Shangai Biomax Green Energy | 2013 | 2 MSW pretreatment lines (183.000 t/year), 2 MSW post-treatment lines | MSW: 2 x 20 t/h MSW: 2 x 25 t/h | MSW |
C&D Waste Treatment Plant | Rivas, Madrid | Spain | Bioservicios Transporte | 2013 | 1 C&D waste treatment line (100.000 t/year) | C&D: 50 t/h | CD |
Dry Recyclables Treatment Plant | Soria | Spain | RSU Soria UTE | 2013 | 1 Dry Recyclables sorting line (6.000 t/year), with baling system | Dry Recyclables: 2 t/h | Light packages |
C&D Waste Treatment Plant | Uruñuela, La Rioja | Spain | Julio Angulo, S.A. | 2013 | 1 C&D waste treatment line (100.000 t/year) | C&D: 50 t/h | CD |
Línea completa de recogida y transporte de fracción orgánica de RSU mediante el sistema TCC (Transportador Cerrado Contínuo) | Almeria | Spain | CESPA | 2013 | MSW | ||
Ampliación de planta de selección | Soria | Spain | RSU Soria UTE | 2013 | MSW | ||
Ampliación planta de selección | Barcelona | Spain | Ecoparc del Besos | 2013 | MSW | ||
Dry Recyclables Treatment Plant | Ponferrada, León | Spain | UTE Legio VII | 2013 | 1 Dry Recyclables sorting line with bag opener, metals separation, plastic film aspiration system and baling system | Dry Recyclables: 3 t/h | Light packages |
Dry Recyclables Treatment Plant | León | Spain | UTE Legio VII | 2013 | 2 Dry Recyclables sorting lines with bag openers, metals separation, plastic film aspiration system and baling system | Dry Recyclables: 2 x 3 t/h | Light packages |
MSW Composting Plant | Zunyi | China | Zunyi Municipality | 2013 | 2 MSW pretreatment lines (220.000 t/year), 20 aerobic digestion tunnels, 1 compost refinement line | MSW: 2 x 45 t/h Aerobic Digestion Tunnels: 20 Refinement: 30 t/h | MSW |
MSW and Dry Recyclables Treatment Plant | San Román de la Vega, León | Spain | UTE Legio VII | 2013 | 3 MSW pretreatment lines, 1 Dry Recyclables treatment line, aerobic digestion tunnels with automatic feed and discharge system, 1 compost refinement line | MSW: 3 x Dry Recyclables Aerobic Digestion Tunnels:Refinement: | MSW |
Planta de compostaje | L'Espluga de Francoli-Tarragona | Spain | UTE Planta Francoli | 2013 | FORM | ||
Planta de compostaje | Olot-Girona | Spain | UTE Planta Compostatge Olot | 2013 | FORM | ||
MSW Composting Plant of Reciplasa | Onda, Castellón | Spain | UTE Onda | 2013 | Facility of 14 aerobic digestion tunels (40.000 t/year) coming from MSW pretreatment line | Aerobic Digestion Tunnels: 14 | Biological |
Upgrade in Ecoparc 1 | Barcelona | Spain | UTE Ecoparc | 2013 | Upgrade of the existing line, including baling system and 4 PET bottle piercers | - | Reengineering |
MSW Treatment plant (Ecoparc-2) | Barcelona | Spain | Ecoparc del Besós | 2013 | 2 MSW pretreatment lines (300.000 t/year), 1 OFMSW pretreatment line, 2 compost refinement lines | MSW: 2 x 45 t/h MSW (FORM): 25 t/h Refinement: 2 x 50 t/h | MSW |
Planta de compostaje | Tàrrega-Lleida | Spain | UTE Sufi-Romero Polo | 2012 | FORM | ||
Planta de compostaje | Tremp-Lleida | Spain | UTE Tremp | 2012 | FORM | ||
Upgrade of the MSW Composting and Dry Recyclables Plant | Albox, Almería | Spain | UTE Almanzora | 2012 | Upgrade of the existing plant, including direct feeder to refuse's baler, 2 PET bottle piecers, non-ferrous metals separators, film aspiration system, bag opener with feed conveyor belt | - | Reengineering |
Industrial Waste Treatment Plant | Hospitalet, Barcelona | Spain | GELABERT GR | 2012 | 1 sorting line for recovery of recyclable materials | IND: 5 t/h | Industrial |
OFMSW and Dry Recyclables Treatment Plant | Barcelona | Spain | Mercabarna | 2012 | 1 OFMSW pretreatment line, 1 Dry Recyclables sorting line, and line feeder | - | Light packages |
MSW Composting Plant | Estepa, Sevilla | Spain | Befesa | 2012 | Facility of aerobic digestion tunnels (10.000 t/year) | Aerobic Digestion Tunnels: 3 | Biological |
Remodelling of the Dry Recyclables Treatment Plant of Maresme | Mataró, Barcelona | Spain | Construccions Riera | 2012 | Total remodelling of the existing line | - | Reengineering |
Dry Recyclables Treatment Plant | Vacarisses, Barcelona | Spain | HERA Tratesa | 2012 | 1 manual sorting line for recovery of recyclable materials and baling system | - | Light packages |
Ampliación planta de selección | Puerto de Santa Maria - Cadiz | Spain | Cespa Conten | 2012 | LPW | ||
Upgrade of the Dry Recyclables Treatment Plant | Amorebieta, Vizcaya | Spain | BZB | 2012 | Upgrade of the existing plant, including non-ferrous metal separator and automatization of the Dry Recyclables sorting process | - | Reengineering |
MSW Composting Plant | Valladolid | Spain | FCC, S.A., Agua y Medio Ambiente, S.A. y Zarzuela, S.A. Empresa Constructora U.T.E. | 2011 | 1 MSW pretreatment line (200.000 t/year), 22 aerobic digestion tunnels with automatic feed and discharge system, 1 compost refinement line | MSW: 30 t/h Aerobic Digestion Tunnels: 22Refinement: 30 t/h | MSW Biological |
Upgrade of the Dry Recyclables Treatment Plant | Tudela, Navarra | Spain | FCC | 2011 | Upgrade of the existing plant, including supply of bag opener and conveyor belts | - | Reengineering |
Upgrade in Ecoparc 1 | Barcelona | Spain | UTE Ecoparc | 2011 | Air and gas treatment system, lock system for tunnels | - | Biological |
OFMSW Composting Plant | Hellín, Albacete | Spain | Tragsa | 2011 | 1 OFMSW pretreatment line, 1 compost refinement line | OFMSW: 20 t/h Refinement: 15 t/h | Biological |
MSW Composting and Dry Recyclables Treatment Plant | Albox, Almería | Spain | UTE Almanzora | 2011 | 1 MSW pretreatment line (180.000 t/year), 1 Dry Recyclables line, composting unit in closed building, 1 compost refinement line | MSW: 30 t/h Dry Recyclables: 3 Refinement: 20 t/h | MSW |
MSW and Dry Recyclables Treatment Plant | Amorebieta, Vizcaya | Spain | BZB | 2011 | 1 MSW sorting line, 1 Dry Recyclables sorting line | Dry Recyclables: 3 t/h | Light packages |
MSW Composting Plant of Valdemingómez (Las Dehesas) | Madrid | Spain | UTE Vertresa R.F. Proces | 2011 | 4 MSW pretreatment lines, 44 aerobic digestion tunnels with automatic feed and discharge system, 2 compost refinement lines | MSW: 4 x 55 t/h Composting tunnels: 44 Refinement: 2 x 75 t/h | MSW |
OFMSW Composting Plant | Sant Cugat, Barcelona | Spain | TMA | 2011 | 1 OFMSW pretreatment line, 1 compost refinement line | OFMSW: 15 t/h Refinement: 10 t/h | Biological |
MSW and Dry Recyclables Treatment Plant | Tudela, Navarra | Spain | FCC | 2011 | 1 MSW sorting line, 1 Dry Recyclables sorting line | Dry Recyclables: 3 t/h | Light packages |
OFMSW Composting Plant | Baix Camp, Tarragona | Spain | Secomsa | 2011 | 1 OFMSW pretreatment line, 1 compost refinement line | OFMSW: 30 t/h Refinement: 20 t/h | Biological |
Dry Recyclables Treatment Plant | Mollet del Vallés, Barcelona | Spain | Cespa GR | 2011 | 1 manual sorting line for recovery of recyclable materials | Dry Recyclables: 1,5 t/h IND: 4 t/h | Light packages |
Planta de transferencia de residuos sólidos | Barcelona | Spain | Ecosenda | 2011 | MSW | ||
Modificación en planta de compostaje | Botarell-Baix Camp (Tarragona) | Spain | SECOMSA | 2010 | MSW | ||
UEP- Installation modification for the recovery of ferrouses and aluminiums in UTE Solsonès | El Solsonès | Spain | Catalonia waste agency | 2010 | Finished project | - | MSW |
EP Film suction | Tudela | Spain | FCC-Tudela | 2010 | Finished project | - | Plastic film |
Conveyor collection tape from the Campdorà waste energy recovery plant | Campdorà , Girona | Spain | Trargisa | 2010 | Finished project | 10t/h | MSW rejection |
Film aspiration and Optical Separator | Moratiel-Peralta | Spain | Commonwealth of RSU Ribera Alta de Navarra | 2010 | Finished project | - | P MRF - Light Packaging (EELL) |
Various Modifications CVO Seixal Line | Seixal | Portugal | Amarsul | 2010 | Finished project | 30t/h | MSW |
Reversible tape Zubieta | Zubieta , Guipúzcoa | Spain | Traco Iberica SL | 2009 | Finished project | - | MSW rejection |
Inductive separator replacement | Alverca | Portugal | Valorsul | 2009 | Finished project | 10t/h | Industrial waste |
Foucault integration | Aranda de Duero | Spain | FCC Servicios ciudadanos | 2009 | Finished project | - | |
Conveyors for Danel Rosas | El Prat de Llobregat | Spain | Picvisa / Calaf industrial | 2009 | Finished project | - | MSW |
Increase capacity and optimization | Lisboa | Portugal | Valorsul | 2009 | Finished project | - | Light Packaging (EELL) |
3 dust captions for the Olot composting plant | Olot , Girona | Spain | Aquambiente, Serv.Sector Del Agua, S.A.U | 2009 | Finished project | - | Biological |
Destruction documents line | Riudellots de la Selva , Girona | Spain | Tirgi | 2009 | Finished project | - | P MRF - Light Packaging (EELL) |
PLC upgrades | Peralta | Spain | Ecoembes | 2009 | Finished project | - | PLC upgrades |
Lalin NFU line | Lalín , Pontevedra | Spain | Urbaser | 2009 | Finished project | - | Industrial waste |
Re+ UTE EBRO plant | Zaragoza | Spain | Urbaser | 2008 | Finished project | - | MSW |
Re+ Las Dehesas plant | Madrid | Spain | FCC Servicios ciudadanos | 2008 | Finished project | 60t/h | MSW |
COGERSA-PICVISA TR y SB | Gijón | Spain | Picvisa / Calaf industrial | 2008 | Finished project | 6t/h | P MRF - Light Packaging (EELL) |
EELL Feeder and Belt | Salamanca | Spain | FCC Servicios ciudadanos | 2008 | Finished project | 5t/h | Light Packaging (EELL) |
CHO-POWER Morcenx (F-40) Modification Sorties Fe & Lourds | Morcenx | France | CHO-POWER | 2008 | 4t/h | Industrial waste | |
Aluminum Refinement Line | Torres Novas | Portugal | RVO - Reciclagem e Valorização Outeirense, Lda | 2008 | 6t/h | Industrial waste | |
Modification of the homogenizer tube feed | Béziers | France | Communauté d'agglomération Béziers Méditerranée | 2008 | Finished project | 10t/h | MSW |
MSW - MBT & Refinement plants | Helias | Greece | Mesogeos | 2008 | 36t/h | MSW + Refinement | |
Compostage plant | Tudela | Spain | FCC Servicios ciudadanos | 2007 | Finished project | - | Biological |
GHK2 CMG2 Mechanical Treatment Biomethanization | Zubieta , Guipúzcoa | Spain | FCC Servicios ciudadanos | 2007 | Finished project | 25t/h | MSW rejection |
Tàrrega conveyor feeder | Tàrrega , Lleida | Spain | Consorci per a la gestió de residus urbans de l'Urgell | 2007 | Finished project | 25t/h | P COM - Commingled |
Metal line modification | Granollers , Barcelona | Spain | Ferimet (Grupo CELSA) | 2007 | Finished project | 5t/h | Industrial waste |
Compostage plant | Serín | Spain | OHL (COGERSA) | 2007 | - | Composting | |
Engineering conveyor for Recycomb pelletizing unit (Argentina) | Cornelio Procopio | Brazil | Iguaçumec | 2006 | 3t/h | RDF | |
Installation of Trommel on the Refining Line | Seixal | Portugal | Amarsul | 2006 | 15t/h | FORM | |
Film Aspiration, Screening and Baling System and Mixed Flat Packaging | Grandula | Portugal | Ambilital | 2006 | 25t/h | MSW | |
Project CRESSEX EELL | CRESSEX | United Kingdom | AMUT SpA | 2006 | Finished project | 7t/h | P MRF - Light Packaging (EELL) |
SUEZ NEOVAL - Salindre (F-30) - Modification of OP outputs | Salindres | France | Suez Groupe | 2006 | Finished project | 20t/h | MSW rejection |
Remodeling of the Amarsul CVO Plant | Seixal | Portugal | Amarsul | 2006 | 30t/h | MSW | |
Improved Paper-Cardboard separation | Lloret de Mar, Girona | Spain | GBI SERVEIS | 2005 | Finished project | - | MSW |
Transport Fangos | Sant Sadurni d´Anoia , Barcelona | Spain | CIATSA | 2005 | Finished project | 5t/h | CSR |
Amarsul Palmela MSW plant extension | Palmela | Portugal | Amarsul | 2005 | 25t/h | MSW | |
Replacement trommel Amarsul Setubal | Setúbal | Portugal | Amarsul | 2005 | 30t/h | MSW | |
Installation for CSE screening & storage line | Beaucaire | France | Chimirec | 2005 | 10t/h | Industrial waste | |
Covertech membrane | Santiago | Chile | Systema Ambiente S.A. | 2005 | Finished project | - | Biological |
Corpus Ambiental | Salto, San Pablo | Brazil | Iguaçumec | 2005 | Finished project | 20t/h | MSW |
Supply of filter and By-Pass CVO refining | Lisboa | Portugal | Amarsul | 2005 | 10t/h | MSW | |
Rest + EELL lines | Loeches , Madrid | Spain | ECOMESA , FCC Servicios ciudadanos | 2004 | - | MSW + Light Packaging (EELL) | |
Glass recovery line | Barcelona | Spain | Ecoparc del Besós, Ecoparc 2 | 2004 | - | P COM - Commingled | |
2 Terminator lines rest | Madrid | Spain | UTE LAS DEHESAS - Urbaser | 2004 | Finished project | 55t/h | MSW rejection |
Replacement of 2 OMR feeders | Varennes-Jarcy | France | Urbasys - Urbaser Environnement | 2004 | Finished project | 50t/h | MSW |
CSR line & DAE line modernization | Montech | France | DRIMM Groupe Séché | 2004 | 18t/h | Industrial waste | |
CSR DRYING LINE | Alentejo | Portugal | Ambilital | 2004 | 10t/h | RDF | |
Various equipment pretreatment line | El Segriá | Spain | Valoriza servicios medioambientales | 2003 | 30t/h | MSW | |
Conveyor CQ MIX | Alter do Chão | Portugal | Valnor | 2003 | 3t/h | Light Packaging (EELL) | |
Remodeling and plant improvements | Cordoba | Spain | SOLTEP - SADECO | 2003 | 30t/h | MSW | |
Ballistic Separators / Prepared for double PEBD aspiration | Onda , Castellón | Spain | UTE Onda | 2003 | Finished project | 21t/h | MSW |
4th lane Juan Grande | Juan Grande , Gran Canaria | Spain | Ferrovial servicios | 2003 | Finished project | - | Biological |
Refinement plant | Epele , Guipúzcoa | Spain | GHK | 2002 | Finished project | 5t/h | Composting |
Modification of the glass line rejection | Mataró , Barcelona | Spain | UTE TEM Tractaments Ecològics del Maresme | 2002 | Finished project | 1t/h | MSW rejection |
Revamping DAE sorting line | Portet-sur-Garonne | France | Maria Valorisation | 2002 | Finished project | 14t/h | Industrial waste |
Ballistic separator replacement | Abajas , Burgos | Spain | Ferrovial servicios | 2002 | Finished project | - | MSW |
Waste Treatment Plant with Composting | Chetumal | Mexico | INTRASISO SA de CV | 2002 | 25t/h | MSW | |
Thermovalue Plant | Chetumal | Mexico | INTRASISO SA de CV | 2002 | Complete waste energetic valorization line for 7 t/h to generate 5,4 MWh el. | 7t/h | SRF |
Engineering Essencis Caeiras | Sao Paulo | Brazil | Iguaçumec | 2002 | 25t/h | MSW | |
Waste Treatment Plant | El Cardenal Municipio de Atitalaquia | Mexico | ESMEX Hidalgo S de R.L. de C.V. | 2001 | 40t/h | MSW | |
DAE sorting line | La Courneuve | France | PAPREC GROUP | 2001 | 20t/h | Industrial waste | |
Sorting Plant for MSW | Jombang | Indonesia | PT. ADHI KARYA | 2001 | 5t/h | MSW | |
DAE line studies and assembly | Elne | France | Patrick Tubert S.A.R.L | 2001 | 10t/h | Industrial waste | |
Improvement of Ambilital's TM Line for Quality Control | Ermidas-Sado | Portugal | Ambilital | 2000 | 30t/h | MSW | |
New press implantation | Barcelona | Spain | Ecoparc del Besós, Ecoparc 2 | 2000 | - | P MRF - Light Packaging (EELL) | |
Improvements to the rest Fraction Treatment Line | Espluga de Francolí , Tarragona | Spain | Consell Comarcal de la Conca de Barberà | 1999 | 17t/h | MSW | |
Film capture | Villena | Spain | Consorcio para la Ejecución de las Previsiones del Plan Zonal de Residuos 8. Área de Gestión A3 | 1999 | - | Light Packaging (EELL) | |
RECIGAS / Zabalgarbi feeding conveyors | Bilbao | Spain | FCC Servicios ciudadanos | 1999 | 2t/h | - | |
CRAMBO 3400E CU | Manresa | Spain | Consorci del Bages per la Gestio de Residus | 1998 | 25t/h | - | |
Automatic Metal Segregation | Pedro Leopoldo | Brazil | Iguaçumec | 1997 | 10t/h | RDF | |
Supply and Assembly of PK conveyor | Famalicão | Portugal | ECOIBERIA | 1996 | 10t/h | Industrial waste | |
TOXIC AND HAZARDOUS INCINERATION LINE | Canovelles (Barcelona) | Spain | BISER THERMOTECH | INCINERATION LINES FOR TOXIC AND HAZARDOUS WASTE | 1,4t/h | TOXIC, HAZARDOUS AND MEDICAL WASTE | |
TOXIC AND HAZARDOUS INCINERATION FEEDING, ROTARY KILN AND POSTCOMBUSTION CHAMBER | Sulair City | Saudi Arabia | TECAM | INCINERATION LINES FOR TOXIC AND HAZARDOUS WASTE | 1t/h | TOXIC, HAZARDOUS AND MEDICAL WASTE |