Case study of FCC ECOMESA
Plant for processing 230,000 tons of waste per year with maximum efficiency

Plant
La Campiña Environmental Complex
Client
FCC ECOMESA
Year
2020
Location
Loeches, Madrid
Country
Spain
A benchmark facility in efficiency, sustainability, and technology applied to recycling
Bianna x FCC ECOMESA
Project details for FCC ECOMESA
State-of-the-art waste treatment plant specializing in the processing of MSW and light packaging. The facility has an impressive annual treatment capacity of 220,000 tons for MSW and 13,000 tons for light packaging. Equipped with advanced technologies, the complex ensures maximum efficiency and environmental responsibility in waste management, aligning with modern sustainability goals.
- Waste treated MSW and light packaging
- Line capacity 10 t/h of packaging and 2 x 35 t/h of MSW (70 t/h of MSW in total)
- Treatment capacity 13,000 tons of packaging/year and 220,000 tons of MSW/year
- Recovery Recyclable materials
Project image gallery
Plant and specific machines for the project of FCC ECOMESA
Guaranteed operability: performance, longevity and profitability
Ensure plant continuity
Own facilities, shared knowledge
Request a technical visit
Recover your waste, decarbonize your process, and protect your liquidity
Request a study














